As the concrete cures it ll take time for the moisture to escape.
2 part moisture remediation for concrete floors.
Concrete science is still evolving.
Floor moisture and moisture vapor can be cause for concern whether the slab is newly poured or many decades old and regardless of location.
How to prevent moisture.
Vaporsolve 100 lp system is a specially formulated 100 solids epoxy coating designed to comply with astm f 3010 and is for use over concrete with high moisture levels for the purpose of isolating the concrete from moisture sensitive flooring.
If you catch the problem early you may only have to replace a few tiles or.
The floor repair estimate from remediations ranges from as little as 200 to 20 000 or more.
Before applying schönox underlayments prior to installing flexible coverings as well as wood floor.
2 coats 12 lbs per the astm f1869 calcium chloride test method and 85 rh per the astm 2170 relative humidity test.
Part of that process requires testing your slab for moisture content and read more.
This system is applied at 16 mils over concrete.
Regular conditions will require 120 180 days.
Whether used as a subfloor or top layer it can provide facilities with an extremely durable and long lasting application when tested and installed correctly.
Moisture remediation concrete protects surfaces from freeze thaw damage reduces dusting of concrete and increases coating life by as much as 300.
1 coat 8 lbs per the astm f1869 calcium chloride test method and 80 rh per the astm 2170 relative humidity test.
Concrete has become one of the most popular flooring options within facilities today.
The vaporsolve basic system consists of a single coat of vaporsolve 100 a 100 solids epoxy.
Vaporsolve systems are used when concrete has a known moisture problem when concrete dries too slowly to meet the construction schedule and as a preventative measure when concrete doesn t have a vapor retarder.
When the concrete is curing it takes time for moisture to escape but construction time constraints and deadlines can leave concrete without adequate drying time.
However construction deadlines and time constraints may leave concrete without enough time for drying.
While the industry doesn t have all the answers it can be said that moisture issues in concrete floors tend to arise from one of two sources.
Surface preparation must be sufficient to allow pene krete to penetrate the surface.
Even pan poured upper level floors can create moisture problems if sufficient curing time isn t allotted.
Remember these flooring problems are costing the industry 2 4 billion on remediation of concrete slab and floor coverings as a result of moisture related flooring failures.